Increase text size Regular text size Decrease text size
 
  •  
    Road Work

    Click on the map image below for a larger map (pdf). This page will be updated weekly.

    City of Syracuse
    Transportation Projects for September 1-7, 2014
    Project Scope Agency General Location Effective
    Date
    Detour Detour
    Map
    1 Erie Blvd. West
    Bridge Project 
    City of
    Syracuse
    Erie Blvd. West
    bridge over
    Onondaga Creek
    (between Plum St.
    and Franklin St.) 
    All Week Traffic will be reduced to one lane in each direction. Ramp from Erie Blvd to West St. northbound (& I-690) closed. Ramp detour: Eastbound on Erie Blvd: south at Plum to West St, south on S West St., east on Fayette St, north on northbound West St. Arterial.  Westbound on Erie Blvd: south at Franklin St, west on Washington St, north on northbound West Street Arterial. View
    Detour
    Map
    2 Connective
    Corridor Project
    East Genesee St.
    City of
    Syracuse
    East Genesee St.
    between
    Almond St.
    and Townsend St.
    All Week Eastbound traffic maintained throughout.
    Westbound traffic will be  detoured at Almond St. south to Harrison St., west to State St. and north back to East Genesee St. intersection.
    View
    Detour
    Map
    2b Connective
    Corridor Project
    East Genesee St.
    City of
    Syracuse
    East Genesee St.
    between
    Townsend St.
    and State St.
    All Week Eastbound traffic maintained throughout.
    Westbound traffic will be detoured at Townsend St. north to Washington St., west to State St. and south back to East Genesee St. intersection.
    View
    Detour
    Map
    2c Connective
    Corridor Project
    Fayette St.
    City of
    Syracuse
    East Fayette St.
    between Townsend
    and State Street
    All Week Multiple blocks under construction. Eastbound traffic maintained throughout. Westbound  traffic will be detoured at Townsend St. north to Washington St, west to Franklin St, and south back to W. Fayette St. View
    Detour
    Map
    2d Connective
    Corridor Project
    Almond St.
    City of
    Syracuse
    Almond St. between East Fayette St. and East Genesee St. All Week The western southbound lane will be closed due to construction. All southbound traffic will merge into the remaining southbound lane. No detour. N/A
    2e Connective Corridor Project
    East Genesee St.
    City of Syracuse East Genesee St. between Almond St. and Forman Ave. Tuesday-Friday The southern, eastbound lane will be closed due to construction. All eastbound traffic will merge into the remaining eastbound lane. No detour. N/A
    3 West Street City of
    Syracuse
    Northbound West Street from West Fayette St. to
    West Onondaga St.
    All Week Lane closures throughout due to paving and striping. N/A
    4 Midland Avenue
    Bridge
    City of
    Syracuse
    Midland Avenue bridge
    over Onondaga Creek
    All Week
    (continuing
    through
    mid-September)
    Pedestrian access will be maintained.
    Southbound detour: Midland east on Tallman, south on Cortland back to Midland.
    Northbound detour: Midland north on Cortland, west on Tallman, back to Midland. 
    View
    Detour
    Map
    5 West Genesee
    Street
    City of
    Syracuse
    West Genesee St. from
    W. Fayette St. to
    State Fair Blvd.
    All Week Road Closure: Westbound traffic will be detoured north on State Fair Blvd., west on Hiawatha, north on Erie and south on W. Fayette back to Genesee. Eastbound traffic will be detoured south on W. Fayette, and north on Geddes back to Genesee St. Erie Blvd. West traffic will follow the same detours. View
    Detour
    Map
    6 I-690 NYSDOT   Eastbound and Westbound I-690 Tuesday-Friday See attached press release for details, will include exit and lane closures in vicinity or West Street. Press Release
    Event Harrison Street Private Company Harrison Street between Warren and Salina Streets Saturday, Sept. 6, 2014 Road will be closed and traffic detoured around the block during the morning. N/A